Energy Port Masterplan – Ostend

  Client:  Autonoom Havenbedrijf Oostende Size:  658 ha, of which 199 ha water surface Period:  2013 – 2014 Team:  3E, i-propeller, MOP Urban Design, Rebel Work In the framework of the European Interreg project “Sustainable Seaports”, a consortium of companies (3E, MOP Urban Design, i-Propeller and Rebel) commissioned by the Autonomous Port Authority Oostende, worked[…]

DEME Headquarters Masterplan – Zwijndrecht

  Client:  DEME Period:  2015 – present Size:  39 ha of which 10 ha dock Work 3E was contracted by DEME to give form to the masterplan for the DEME site in Zwijndrecht. Through the renovation of its buildings and by an optimal use of renewable energy technologies, an energy-neutral (and if possible energy-autonomous) site[…]

Masterplan Nieuw Zuid Antwerp

  Client:  City of Antwerp Period:  2011-2012 Size:  400.000 m² Team:  Studio Secchi Vigano, 3E Work Construction has started on Antwerp’s brand new 400.000 m² city quarter Nieuw Zuid. It will be located south of the current Zuid (South) district, right next to the Antwerp Court of Justice. Nieuw Zuid will boast 2,000 residences, next[…]

Oude Dokken – Ghent

  Client:  AG Stadsontwikkelingsbedrijf Gent Period:  2009 – 2013 Size:  ca. 45 ha Work The city of Ghent acquired the former docksides near the Dampoort railway station in view of redevelopment. 3E was contracted by the city to contribute to the site masterplan for the site reconversion, being developed by OMA, an urban planners’ office.[…]