DEME Headquarters Masterplan – Zwijndrecht

October 19, 2016
BS_Reference_Page_DEME_825x400

 

Client:  DEME
Period:  2015 – present
Size:  39 ha of which 10 ha dock


Work

3E was contracted by DEME to give form to the masterplan for the DEME site in Zwijndrecht. Through the renovation of its buildings and by an optimal use of renewable energy technologies, an energy-neutral (and if possible energy-autonomous) site will be achieved. This will be done in an economically optimized manner, and in line with the timing of already planned renovations.

3E has a strong culture of innovation, but without compromise to robustness, total cost of ownership and comfort requirements of the proposed solutions in consultation with the client.

3E will continue to support the client throughout the process in an owner’s engineer role.