Academiestraat – Ghent

Client:  3D Invest Period:  2011 – 2014 Team:  Robbrecht en Daem architecten, architecten Tania Van Den Bussche en Els Claessens, Dierendonckblancke architects, MJ Van Hee Architecten, VK Group, 3E, 3D Real Estate, Van Roey Vastgoed, etc. Work The current fire department and academy site is a fascinating challenge in the area of sustainability due to[…]

Genk-Zuid and Ravenshout heating networks – Province of Limburg

Client:  POM Limburg, part of Eco2Profit Period:  2012 – 2013 Team:  3E, Greenvis, Stibbe, Rebel, CEE Engineering Work The province of Limburg has been convinced for a long time that it has a leading role in reducing the impact on the environment. This has translated into a particularly ambitious step, namely the commitment to make[…]

Pier Kornel – Feasibility study heating network on former Tupperware site – Aalst

Client:  Dender Development (Matexi & Re-Vive) Period:  2012 – 2014 Work Dender Development (Matexi & Re-Vive) has been planning the redevelopment of a former industrial site into a residential area in East Flanders. Over a period of five years, approximately 600 residential units will be built, ranging from terraced houses to high-rise building The project[…]

The Suikerfabriek heating network – Veurne

Client:  West Flemish Intermunicipal Period:  2013 Work The West-Vlaamse Intercommunale [West Flemish Intermunicipal], abbreviated to Wvi, is responsible for the integrated planning and project development of industrial parks and residential areas on behalf of the province and 54 West Flemish municipalities. Together with the city of Veurne, Wvi is planning a mixed-use urban development, blending[…]

Sustainable energy strategy for VUB data centre – Brussels

Client:  VUB Period:  2013 Work 3E was asked by the Free University of Brussels (VUB) for assistance in determining a sustainable energy strategy for different types of servers and associated cooling installations and UPS services. This support was part of an overall future strategy adopted by the VUB for grouping servers and supercomputers. Based on[…]

WDP consumption model

Client:  WDP Period:  2013 Work 3E developed an energy consumption model for WDP to calculate the total energy costs of WDP warehouses. The model can also make a comparison with a reference building or a competitor’s building. The results of these calculations are displayed in a simplified version via an App, specially developed for this[…]

Feasibility study for the development of multi-criteria panel for buildings

Client:  Eternit (ETEX GROUP) and Unilin (MOHAWK GROUP) Period:  2011 – 2012 Team:  3E, Th!nk E Work The subject of this feasibility study is to investigate the technical and economic feasibility of a multi-criteria panel to realise a substantial improvement of the existing building stock. This would allow the partners, i.e. Eternit, Unilin and 3E,[…]