Oude Dokken – Ghent

  Client:  AG Stadsontwikkelingsbedrijf Gent Period:  2009 – 2013 Size:  ca. 45 ha Work The city of Ghent acquired the former docksides near the Dampoort railway station in view of redevelopment. 3E was contracted by the city to contribute to the site masterplan for the site reconversion, being developed by OMA, an urban planners’ office.[…]

Château Montrose vineyard – Positive energy renovation – France

  Client:  Bouygues, Maurice Berger Period:  commissioning in 2008 Size:  13.000 m² Work The vineyard of Chateau Montrose comprises a set of buildings (vat room, barrel cellars, bottles cellars,…) representing a total surface of 13 000 m². The new owners of the estate chose to renovate the site completely, maintaining the organization and layout of[…]

Bouygues Energies & Services office building – Montigny-le-Bretonneux

  Client:  Sodearif – Bouygues Construction Period:  2007 – 2010 Size:  11.700 m² Team:  Hubert Godet, Sodearif, 3E Work 3E was contracted to perform thermal and lighting analyses, optimisation of building energy needs and assistance to realisation with respect to energy management, with the goal of attaining very high energy performance for this new 11[…]

Brussels Regional Parliament – Brussels

  Client:  Brussels Regional Parliament Period:  2009 – 2013 Size:  1.800 m² Team:  Skope, 3E, Grontmij, Pirnay, Jacques Delens Work This new construction is an office building adjacent to the Brussels Regional Parliament in the historical centre of Brussels. The building was designed by the architect firm Cooparch, with a double transparent envelope on almost[…]

Rova Braie – a BREEAM Excellent multi-residential building – Brussels

  Client:  Rova Braie scrl Period:  2010 – 2014 Team:  Herpain, 3E Work The Rova Braie project consists in a multi residential high-standing building located in Brussels city centre. It has achieved a BREEAM Excellent rating at both design and construction stages thanks to high environmental performances, notably high insulation, ground heat pumps, photovoltaic energy[…]

Abattoir Anderlecht – Brussels

  Client:  Abatan NV Size:  9.700m² food market, 2.200m² shops, 2.500m² dwellings Period:  2011 – 2012 Work 3E supported the project team (architect, office special techniques, etc) with the aim of designing a cost efficient energy concept for the entire project. The shops and dwellings are conditioned and form a defined and insulated heated volume.[…]

Energy Port Masterplan – Ostend

  Client:  Autonoom Havenbedrijf Oostende Size:  658 ha, of which 199 ha water surface Period:  2013 – 2014 Team:  3E, i-propeller, MOP Urban Design, Rebel Work In the framework of the European Interreg project “Sustainable Seaports”, a consortium of companies (3E, MOP Urban Design, i-Propeller and Rebel) commissioned by the Autonomous Port Authority Oostende, worked[…]

Cours Saint-Michel – Brussels

  Client:  P&V Size:  13.500 m² Period:  2009 – 2016 Team:  DDS & Partners, Technical and Data Consulting, Herpain, 3E Work P&V’s ”Cours Saint-Michel” building is a 20 year old, 13.500 m² office space in Brussels. The renovation is part of P&V’s sustainability strategy, focused on rationalizing energy use to optimize the added-value and image[…]

“Natuurbuurt” concept – energy design

  Client:  Bostoen Period:  2015 – 2016 Work Bostoen, project developer of passive dwellings, asked 3E to analyse which (collective) energy concept is cost-optimal for its new residential “Natuurbuurt” neighbourhood concept. Based on a detailed cost benefit analysis, 3E compared the feasibility of several collective energy systems with the currently used individual energy system approach.[…]

DEME Headquarters Masterplan – Zwijndrecht

  Client:  DEME Period:  2015 – present Size:  39 ha of which 10 ha dock Work 3E was contracted by DEME to give form to the masterplan for the DEME site in Zwijndrecht. Through the renovation of its buildings and by an optimal use of renewable energy technologies, an energy-neutral (and if possible energy-autonomous) site[…]