Albertkanaal – Concept study sustainable redevelopment of a business park

Client:  The City of Antwerp Period:  2015 – 2016 Team:  Posad Spatial Strategies, Arcadis, 3E, One Architecture Work The aim of the study is to contribute towards the project area having a sustainable future, with the intention of influencing other business parks experiencing with similar problems. The way in which this is realised is by[…]

Town Hall of Hasselt design support – Hasselt

© Jaspers-Eyers Architects Client:  Democo Group Period:  2015 – 2016 Work 3E provided specific technical support to the Democo Group relating to the problem of private cables for photovoltaic production (in consultation with Infrax), energy performance requirements, BREEAM certification, etc. The structural work for the new Town Hall of Hasselt must be completed by the[…]

Quartier Bleu – Wind comfort and solar analysis – Hasselt

  Client:  Kanaalkom Development NV – Matexi Period:  2016 Work On behalf of Matexi, 3E analysed the wind comfort for pedestrians and future residents of the project area of ‘Quartier Bleu’ in Hasselt. Additionally, an analysis was made of the number of hours of sunlight exposure at several sites located at outside gastro/pub terraces along[…]

Nieuw Gent – Energy scenario study of high-rise towers – Ghent

  Client:  WoninGent cvba Period:  2016 Team:  3E, Buro II & ArchI+I Work In response to the “Revitalisation of New Ghent” project, whereby a preliminary urban development study will be drawn up for the area surrounding the existing high-rise towers, the City of Ghent wants to support its decision to proceed with renovations, replacement construction[…]

Oude Dokken – Ghent

  Client:  AG Stadsontwikkelingsbedrijf Gent Period:  2009 – 2013 Size:  ca. 45 ha Work The city of Ghent acquired the former docksides near the Dampoort railway station in view of redevelopment. 3E was contracted by the city to contribute to the site masterplan for the site reconversion, being developed by OMA, an urban planners’ office.[…]

Château Montrose vineyard – Positive energy renovation – France

  Client:  Bouygues, Maurice Berger Period:  commissioning in 2008 Size:  13.000 m² Work The vineyard of Chateau Montrose comprises a set of buildings (vat room, barrel cellars, bottles cellars,…) representing a total surface of 13 000 m². The new owners of the estate chose to renovate the site completely, maintaining the organization and layout of[…]

Bouygues Energies & Services office building – Montigny-le-Bretonneux

  Client:  Sodearif – Bouygues Construction Period:  2007 – 2010 Size:  11.700 m² Team:  Hubert Godet, Sodearif, 3E Work 3E was contracted to perform thermal and lighting analyses, optimisation of building energy needs and assistance to realisation with respect to energy management, with the goal of attaining very high energy performance for this new 11[…]

Brussels Regional Parliament – Brussels

  Client:  Brussels Regional Parliament Period:  2009 – 2013 Size:  1.800 m² Team:  Skope, 3E, Grontmij, Pirnay, Jacques Delens Work This new construction is an office building adjacent to the Brussels Regional Parliament in the historical centre of Brussels. The building was designed by the architect firm Cooparch, with a double transparent envelope on almost[…]

Rova Braie – a BREEAM Excellent multi-residential building – Brussels

  Client:  Rova Braie scrl Period:  2010 – 2014 Team:  Herpain, 3E Work The Rova Braie project consists in a multi residential high-standing building located in Brussels city centre. It has achieved a BREEAM Excellent rating at both design and construction stages thanks to high environmental performances, notably high insulation, ground heat pumps, photovoltaic energy[…]

Abattoir Anderlecht – Brussels

  Client:  Abatan NV Size:  9.700m² food market, 2.200m² shops, 2.500m² dwellings Period:  2011 – 2012 Work 3E supported the project team (architect, office special techniques, etc) with the aim of designing a cost efficient energy concept for the entire project. The shops and dwellings are conditioned and form a defined and insulated heated volume.[…]

Energy Port Masterplan – Ostend

  Client:  Autonoom Havenbedrijf Oostende Size:  658 ha, of which 199 ha water surface Period:  2013 – 2014 Team:  3E, i-propeller, MOP Urban Design, Rebel Work In the framework of the European Interreg project “Sustainable Seaports”, a consortium of companies (3E, MOP Urban Design, i-Propeller and Rebel) commissioned by the Autonomous Port Authority Oostende, worked[…]

Cours Saint-Michel – Brussels

  Client:  P&V Size:  13.500 m² Period:  2009 – 2016 Team:  DDS & Partners, Technical and Data Consulting, Herpain, 3E Work P&V’s ”Cours Saint-Michel” building is a 20 year old, 13.500 m² office space in Brussels. The renovation is part of P&V’s sustainability strategy, focused on rationalizing energy use to optimize the added-value and image[…]

“Natuurbuurt” concept – energy design

  Client:  Bostoen Period:  2015 – 2016 Work Bostoen, project developer of passive dwellings, asked 3E to analyse which (collective) energy concept is cost-optimal for its new residential “Natuurbuurt” neighbourhood concept. Based on a detailed cost benefit analysis, 3E compared the feasibility of several collective energy systems with the currently used individual energy system approach.[…]

DEME Headquarters Masterplan – Zwijndrecht

  Client:  DEME Period:  2015 – present Size:  39 ha of which 10 ha dock Work 3E was contracted by DEME to give form to the masterplan for the DEME site in Zwijndrecht. Through the renovation of its buildings and by an optimal use of renewable energy technologies, an energy-neutral (and if possible energy-autonomous) site[…]

Wattson – 3E’s ESCO offering energy saving services in a DRFM-concept

  Client:  Senior Living Group (the Belgian daughter of the French Korean group) Period:  2013 – present Work Senior Living Group (“SLG”, the Belgian daughter of the French Korian group) is managing about 50 homes for elderly people in Belgium. In 2013 SLG approached 3E to guide them in improving the energy efficiency of their[…]

Quatuor building – Brussels

  Client:  Befimmo via ABV Environment Period:  January – June 2016 Size:  65.000 m² Team:  Jaspers & Eyers, VK Engineering, Bopro, ABV-Environnement, 3E Work The real-estate operator Befimmo is planning to construct the “Quatuor Building”, a new office building of 60.000 m² situated near the Rogier square in Brussels, in order to replace the actual[…]

Energy transition for social housing – Godarville

  Client:  La Ruche Chapelloise Period:  January – July 2016 Period:  +/- 1300 dwellings Work The social housing company ‘La Ruche Chapelloise’ has the ambition to drastically improve the sustainability of its housing stock, counting over 1300 dwellings, by introducing renewable energies en energy efficiency. 3E was contracted to make an optimised proposal for possible[…]

3E Optimal Control Services – Increasing system performance through data

  Client:  3E – internal product (software) development Period:  2014 – 2016 Work 3E is developing software for optimal control of dynamic systems. Our focus is twofold: the building energy sector and the hybrid energy systems. Our approach is Model Predictive Control combined with greybox system identification. The combination of these powerful techniques optimizes the[…]

qfghsdth

Masterplan Nieuw Zuid Antwerp

  Client:  City of Antwerp Period:  2011-2012 Size:  400.000 m² Team:  Studio Secchi Vigano, 3E Work Construction has started on Antwerp’s brand new 400.000 m² city quarter Nieuw Zuid. It will be located south of the current Zuid (South) district, right next to the Antwerp Court of Justice. Nieuw Zuid will boast 2,000 residences, next[…]