Owner’s Engineering – Belgium

  Client:  Vasco & Alro Location:  Dilsen Stokkem wind farm, Belgium Project size:  12MW (6 Senvion MM100) Period:  2015-2017 Work – WTG package tender preparation and management – TSA contract negotiation – BOP civil & electrical follow up – Construction management

Independent Engineering – Mauritius Island

  Client:  Quadran Grid Operator:  Central Electricity Board (CEB) Location:  Eole Plaine des Roches wind farm, Mauritius Island Project size:  9.35MW (11 Gamesa G58) Period:  2014-2016 Work – Electrical Design Verification – Construction monitoring (monthly reporting) – Grid Compliance verification before Commercial Operation Date – Facility Power Curve assessment

Component inspection – Belgium

  Client:  Storm Location:  Meer, Belgium Period:  2014 Work – Visual inspection of nacelle, blades and tower section – Lightning protection system check/measurements for blades

Independent Engineering – South Africa

  Client:  Biotherm Location:  Dassiesklip Project size:  27MW (9 Sinovel SL 3000 3MW) Period:  2013-2015 Work – Design review – Construction monitoring (monthly reporting) – Grid Compliance verification before Commercial Operation Date – Facility Power Curve assessment (1 year after COD)

Owner’s engineer – Oman

  Client:  Masdar Location:  Dhofar wind farm Project size:  50MW Period:  2016 Work – Resident consultant for 6 weeks in Abu Dhabi – EPC Tender technical documentation analysis – Bidder technical documentation analysis – Gap analysis of bidder’s offers – Overall offer ratings for each bidder (6) – Recommendations to client

Constraint Mapping – France

  Client:  ERG Location:  Various projects in France Project size:  300MW portfolio Period:  2016 Work – Technical constraint analysis in GIS – Environmental constraint analysis in GIS – Administrative constraint analysis in GIS – Indicative layout preparation and preliminary energy yield assessment – Overall project feasibility assessment

EPC contract negotiation – Turkey

  Client:  Calik Enerji Location:  Demircili and Sarpıncık cind farm Project size:  Demircili (40MW), Sarpıncık (32MW), Nordex N90 wind turbines Period:  2014 Work – Definitions – Scope of work – Obligations of the parties – planning – Warranties – Liquidated damages and caps – Force Majeure and Terminations

Component inspection – Belgium

  Client:  Storm Location:  Minderhout, Belgium Period:  2017 Work – Visual inspection of nacelle, blades and tower section – Lightning protection system check/measurements for blades

Resident Engineer – Turkey

  Client:  Zaf Group/Tefirom Location:  Sembuk wind farm, Turkey Project size:  27MW (9 Vestas V112 3MW) Period:  2014 Work – Daily toolbox talks – Daily walks around and quality audits – Contractor’s documentation review & approval – Weekly reporting to client – Wind turbine inspections – Snag List preparation and follow up – Support for[…]

M&A Technical Due Diligence – Belgium

  Client:  CGN Bank: Uni Credit Location:  Estinnes wind farm, Belgium Project size:  81MW (11 Enercon E126 7/8MW) Period:  2016 Work – O&M reports review and performance analysis – Energy yield re-assessment based on SCADA data – O&M contract review – PPA review – Financial Model review

M&A Technical Due Diligence – France

  Client:  Susie Partners Bank: Belfius Location:  Lamballe wind farm, France Project size:  10MW (4xN90 2.5) Period:  2015 Work – O&M reports review and performance analysis – Energy yield re-assessment based on SCADA data – Wind turbine inspection (gearboxes, visual) – O&M contract review – Financial Model review

Lender’s Technical Advisory (Refinancing) – Belgium

  Client:  Vleemo Bank: Belfius Location:  Zandvliet I & II, Belgium Project size:  12MW Period:  2015 Work – O&M reports review and performance analysis – Energy yield re-assessment based on SCADA data – Wind turbine inspection (blade, gearboxes, visual) – Wind Turbine design & technology review – O&M and TCMA review – Financial Model review

Lender’s Technical Advisory (Wind/Storage) – Guadeloupe, France

  Client:  NW Energy Bank: CIC Location:  Grand Rivière, Guadeloupe Project size:  14MW (7 Vestas V100 2MW) Period:  2016-2017 Work – Energy yield assessment – Storage and anti-cyclonic system design & technology review – Wind Turbine design & technology review – TSA, BOP and O&M review/negotiation – Financial Model review – Construction monitoring & monthly[…]

Lender’s Technical Advisory – Belgium

  Client:  Wind aan de Stroom Bank: KBC Location:  Port of Antwerp Project size:  48MW (16x Siemens SWT 113 3MW) Period:  2013-2017 Work – Energy yield assessment – Design & technology review – Grid code compliance review – EPC and O&M review/negotiation – Financial Model review – Construction monitoring (monthly drawdown reporting) – Take Over[…]

Lender’s Technical Advisory – South Africa

  Client:  Innowind (EDF subsidiary in South Africa) Bank: ABSA Capital, IDC Location:  Chaba, Grassridge and Waainek, South Africa Project size:  Chaba (21MW), Grassridge (61.5MW), Waainek (24MW) Period:  2013-2017 Work – Energy yield assessment – Design & technology review – Grid code compliance review – PPA review – EPC and O&M review/negotiation – Financial Model[…]

WTG transformer verification – France

  Client:  Quadran Location:  Dainville, France Project size:  24MW (12 Vestas V110 2MW) Period:  2017 Work – Follow up on on-site WTG transformer mounting into the nacelles – Visual inspection and torque verification – Compliance verification with transformer manufacturer’s requirements

End of warranty inspection – France

  Client:  Innovent Location:  Valhuon, France Project size:  2MW (1 Enercon E70 2MW) Period:  2015 Work – Wind turbine visual inspection – Blade inspection (by cherry picker)

Wind turbine inspection – France

  Client:  AlpiQ Location:  Gravière wind farm, France Project size:  10.5MW (6 Vestas V66) Period:  2016 Work – Wind Turbine and infrastructure visual inspection – Blade inspection – Gearbox inspection (endoscope) – Gearbox oil analysis

Lidar Measurements – Luxemburg

  Client:  SEO Location:  Luxemburg Project size:  12.6MW Period:  2015-2016 Work – Wind measurement campaign definition – Lidar deployment for 6 months at 2 different positions across the site – Long term energy yield assessment

Uncovering wind potential in Eastern Europe

Country:  Croatia, Estonia, Lithuania, Moldova, Romania, Ukraine. Period:  2007 – 2009 Work Preparation of large-scale wind resources assessment in several countries around the Black Sea and carrying out wind measurements, wind mapping for larger areas and provision of bankable reporting and guidance in completing the full micro-siting and turbine selection for large new projects. 3E[…]