Inverter Behaviour Assessment

Country:  Belgium Period:  2011 Work 3E worked for Fronius and Sunswitch as as an independent technical advisor to assess the actual behaviour of the Fronius inverters. Tasks consisted on a site visit, measurements analysis and checking the Fronius interpretation of the inverters behaviour. 3E also performed a calculation of energy and yield losses in order[…]

Technical due diligence of DG Infra’s photovoltaic portfolio in Belgium

  Country:  Belgium Period:  2011 – 2015 Work Technical due diligence services on DG Infra photovoltaic portfolio in Belgium. More than 30 rooftop and ground mounted PV projects being developed and constructed by Fabricom (GDF Suez Group). Total capacity of more than 25MW. 3E reports served both the investor (DG Infra) and the lender (KBC[…]

Technical due diligence of Enfinity’s photovoltaic portfolio in Belgium

  Country:  Belgium Period:  2011 – 2014 Work Lender’s technical advisor services on Enfinity’s photovoltaic portfolio (Duty of Care towards Lenders Fieva, Belfuture, and Triodos) in Belgium. More than 60 rooftop PV projects being developed and constructed by Enfinity. Total capacity of more than 40MW. 3E reports served the lenders (Rabobank NL, Triodos Belgium, and[…]

Dilsen-Stokkem wind farm

  Country:  Belgium Period:  2015 Work Vasco Group, a Belgian industrial group, was granted the permit for the construction of 4 wind turbines, for a total installed capacity of 8MW, in Dilsen Stokkem, near the border with the Netherlands. 3E was contracted to finalize the electrical ad civil engineering, manage the tendering process for the[…]

Vleemo – Technical Due Diligence of the Port of Antwerp

  Country:  Belgium Period:  2016 Work Vleemo contracted 3E for the technical Due Diligence of the Port of Antwerpt-right bank project, consisting of 18 Enercon E101 turbines for a total installed capacity of 54MW. The scope of work includes an independent long term energy yield assessment, the review of the building permit and grid connection[…]

Storm Windpower- Project Guidance in Flanders

  Country:  Belgium Period:  2011 – 2015 Work 3E was in charge of project development activities for Storm’s projects in Flanders. 3E wrote the permit application documents (building permit application and environmental permit applications) and reviewed the environmental impact studies, including shadow impact analysis, noise studies and photomontages. Once the project permits were received, 3E[…]