Oude Dokken – Ghent

  Client:  AG Stadsontwikkelingsbedrijf Gent Period:  2009 – 2013 Size:  ca. 45 ha Work The city of Ghent acquired the former docksides near the Dampoort railway station in view of redevelopment. 3E was contracted by the city to contribute to the site masterplan for the site reconversion, being developed by OMA, an urban planners’ office.[…]

Château Montrose vineyard – Positive energy renovation – France

  Client:  Bouygues, Maurice Berger Period:  commissioning in 2008 Size:  13.000 m² Work The vineyard of Chateau Montrose comprises a set of buildings (vat room, barrel cellars, bottles cellars,…) representing a total surface of 13 000 m². The new owners of the estate chose to renovate the site completely, maintaining the organization and layout of[…]

Bouygues Energies & Services office building – Montigny-le-Bretonneux

  Client:  Sodearif – Bouygues Construction Period:  2007 – 2010 Size:  11.700 m² Team:  Hubert Godet, Sodearif, 3E Work 3E was contracted to perform thermal and lighting analyses, optimisation of building energy needs and assistance to realisation with respect to energy management, with the goal of attaining very high energy performance for this new 11[…]

Brussels Regional Parliament – Brussels

  Client:  Brussels Regional Parliament Period:  2009 – 2013 Size:  1.800 m² Team:  Skope, 3E, Grontmij, Pirnay, Jacques Delens Work This new construction is an office building adjacent to the Brussels Regional Parliament in the historical centre of Brussels. The building was designed by the architect firm Cooparch, with a double transparent envelope on almost[…]

Abattoir Anderlecht – Brussels

  Client:  Abatan NV Size:  9.700m² food market, 2.200m² shops, 2.500m² dwellings Period:  2011 – 2012 Work 3E supported the project team (architect, office special techniques, etc) with the aim of designing a cost efficient energy concept for the entire project. The shops and dwellings are conditioned and form a defined and insulated heated volume.[…]

Cours Saint-Michel – Brussels

  Client:  P&V Size:  13.500 m² Period:  2009 – 2016 Team:  DDS & Partners, Technical and Data Consulting, Herpain, 3E Work P&V’s ”Cours Saint-Michel” building is a 20 year old, 13.500 m² office space in Brussels. The renovation is part of P&V’s sustainability strategy, focused on rationalizing energy use to optimize the added-value and image[…]

“Natuurbuurt” concept – energy design

  Client:  Bostoen Period:  2015 – 2016 Work Bostoen, project developer of passive dwellings, asked 3E to analyse which (collective) energy concept is cost-optimal for its new residential “Natuurbuurt” neighbourhood concept. Based on a detailed cost benefit analysis, 3E compared the feasibility of several collective energy systems with the currently used individual energy system approach.[…]

DEME Headquarters Masterplan – Zwijndrecht

  Client:  DEME Period:  2015 – present Size:  39 ha of which 10 ha dock Work 3E was contracted by DEME to give form to the masterplan for the DEME site in Zwijndrecht. Through the renovation of its buildings and by an optimal use of renewable energy technologies, an energy-neutral (and if possible energy-autonomous) site[…]

Quatuor building – Brussels

  Client:  Befimmo via ABV Environment Period:  January – June 2016 Size:  65.000 m² Team:  Jaspers & Eyers, VK Engineering, Bopro, ABV-Environnement, 3E Work The real-estate operator Befimmo is planning to construct the “Quatuor Building”, a new office building of 60.000 m² situated near the Rogier square in Brussels, in order to replace the actual[…]

Energy transition for social housing – Godarville

  Client:  La Ruche Chapelloise Period:  January – July 2016 Period:  +/- 1300 dwellings Work The social housing company ‘La Ruche Chapelloise’ has the ambition to drastically improve the sustainability of its housing stock, counting over 1300 dwellings, by introducing renewable energies en energy efficiency. 3E was contracted to make an optimised proposal for possible[…]