Academiestraat – Ghent

Client:  3D Invest Period:  2011 – 2014 Team:  Robbrecht en Daem architecten, architecten Tania Van Den Bussche en Els Claessens, Dierendonckblancke architects, MJ Van Hee Architecten, VK Group, 3E, 3D Real Estate, Van Roey Vastgoed, etc. Work The current fire department and academy site is a fascinating challenge in the area of sustainability due to[…]

Pier Kornel – Feasibility study heating network on former Tupperware site – Aalst

Client:  Dender Development (Matexi & Re-Vive) Period:  2012 – 2014 Work Dender Development (Matexi & Re-Vive) has been planning the redevelopment of a former industrial site into a residential area in East Flanders. Over a period of five years, approximately 600 residential units will be built, ranging from terraced houses to high-rise building The project[…]

Town Hall of Hasselt design support – Hasselt

© Jaspers-Eyers Architects Client:  Democo Group Period:  2015 – 2016 Work 3E provided specific technical support to the Democo Group relating to the problem of private cables for photovoltaic production (in consultation with Infrax), energy performance requirements, BREEAM certification, etc. The structural work for the new Town Hall of Hasselt must be completed by the[…]

Quartier Bleu – Wind comfort and solar analysis – Hasselt

  Client:  Kanaalkom Development NV – Matexi Period:  2016 Work On behalf of Matexi, 3E analysed the wind comfort for pedestrians and future residents of the project area of ‘Quartier Bleu’ in Hasselt. Additionally, an analysis was made of the number of hours of sunlight exposure at several sites located at outside gastro/pub terraces along[…]

Nieuw Gent – Energy scenario study of high-rise towers – Ghent

  Client:  WoninGent cvba Period:  2016 Team:  3E, Buro II & ArchI+I Work In response to the “Revitalisation of New Ghent” project, whereby a preliminary urban development study will be drawn up for the area surrounding the existing high-rise towers, the City of Ghent wants to support its decision to proceed with renovations, replacement construction[…]

Oude Dokken – Ghent

  Client:  AG Stadsontwikkelingsbedrijf Gent Period:  2009 – 2013 Size:  ca. 45 ha Work The city of Ghent acquired the former docksides near the Dampoort railway station in view of redevelopment. 3E was contracted by the city to contribute to the site masterplan for the site reconversion, being developed by OMA, an urban planners’ office.[…]

Château Montrose vineyard – Positive energy renovation – France

  Client:  Bouygues, Maurice Berger Period:  commissioning in 2008 Size:  13.000 m² Work The vineyard of Chateau Montrose comprises a set of buildings (vat room, barrel cellars, bottles cellars,…) representing a total surface of 13 000 m². The new owners of the estate chose to renovate the site completely, maintaining the organization and layout of[…]

Bouygues Energies & Services office building – Montigny-le-Bretonneux

  Client:  Sodearif – Bouygues Construction Period:  2007 – 2010 Size:  11.700 m² Team:  Hubert Godet, Sodearif, 3E Work 3E was contracted to perform thermal and lighting analyses, optimisation of building energy needs and assistance to realisation with respect to energy management, with the goal of attaining very high energy performance for this new 11[…]

Brussels Regional Parliament – Brussels

  Client:  Brussels Regional Parliament Period:  2009 – 2013 Size:  1.800 m² Team:  Skope, 3E, Grontmij, Pirnay, Jacques Delens Work This new construction is an office building adjacent to the Brussels Regional Parliament in the historical centre of Brussels. The building was designed by the architect firm Cooparch, with a double transparent envelope on almost[…]