Owner’s Engineering – Belgium

  Client:  Vasco & Alro Location:  Dilsen Stokkem wind farm, Belgium Project size:  12MW (6 Senvion MM100) Period:  2015-2017 Work – WTG package tender preparation and management – TSA contract negotiation – BOP civil & electrical follow up – Construction management

Owner’s engineer – Oman

  Client:  Masdar Location:  Dhofar wind farm Project size:  50MW Period:  2016 Work – Resident consultant for 6 weeks in Abu Dhabi – EPC Tender technical documentation analysis – Bidder technical documentation analysis – Gap analysis of bidder’s offers – Overall offer ratings for each bidder (6) – Recommendations to client

M&A Technical Due Diligence – Belgium

  Client:  CGN Bank: Uni Credit Location:  Estinnes wind farm, Belgium Project size:  81MW (11 Enercon E126 7/8MW) Period:  2016 Work – O&M reports review and performance analysis – Energy yield re-assessment based on SCADA data – O&M contract review – PPA review – Financial Model review

M&A Technical Due Diligence – France

  Client:  Susie Partners Bank: Belfius Location:  Lamballe wind farm, France Project size:  10MW (4xN90 2.5) Period:  2015 Work – O&M reports review and performance analysis – Energy yield re-assessment based on SCADA data – Wind turbine inspection (gearboxes, visual) – O&M contract review – Financial Model review

Lender’s Technical Advisory (Refinancing) – Belgium

  Client:  Vleemo Bank: Belfius Location:  Zandvliet I & II, Belgium Project size:  12MW Period:  2015 Work – O&M reports review and performance analysis – Energy yield re-assessment based on SCADA data – Wind turbine inspection (blade, gearboxes, visual) – Wind Turbine design & technology review – O&M and TCMA review – Financial Model review

Lender’s Technical Advisory (Wind/Storage) – Guadeloupe, France

  Client:  NW Energy Bank: CIC Location:  Grand Rivière, Guadeloupe Project size:  14MW (7 Vestas V100 2MW) Period:  2016-2017 Work – Energy yield assessment – Storage and anti-cyclonic system design & technology review – Wind Turbine design & technology review – TSA, BOP and O&M review/negotiation – Financial Model review – Construction monitoring & monthly[…]

Lender’s Technical Advisory – Belgium

  Client:  Wind aan de Stroom Bank: KBC Location:  Port of Antwerp Project size:  48MW (16x Siemens SWT 113 3MW) Period:  2013-2017 Work – Energy yield assessment – Design & technology review – Grid code compliance review – EPC and O&M review/negotiation – Financial Model review – Construction monitoring (monthly drawdown reporting) – Take Over[…]

Lender’s Technical Advisory – South Africa

  Client:  Innowind (EDF subsidiary in South Africa) Bank: ABSA Capital, IDC Location:  Chaba, Grassridge and Waainek, South Africa Project size:  Chaba (21MW), Grassridge (61.5MW), Waainek (24MW) Period:  2013-2017 Work – Energy yield assessment – Design & technology review – Grid code compliance review – PPA review – EPC and O&M review/negotiation – Financial Model[…]

Lender’s Technical Advisory- Bid window 3 in South Africa

  Client:  Networx Energy Period:  2013 Work Networx Energy contracted 3E to act as an independent Lenders Technical Advisor in the development of a 75 MW Solar Photovoltaic facility in the Northern Cape Province of South Africa. The facility was to be debt financed by Nedbank to whom 3E had duty of care. The Project[…]

Full Lender’s Technical Advisory – Kathu – Northern Cape

  Client:  Nedbank Capital & the Industrial Development Corporation Period:  2015 Work Nedbank Capital and the Industrial Development Corporation mandated 3E to act as Lender’s Technical Advisor for PV projects jointly sponsored by Guma Capital and Tozzi Renewable Energy. The projects are debt financed and 3E’s duty of care was to the appointed lenders in[…]

Lender’s Technical Advisor in Senegal

  Client:  GreenWish Partners & Senergy Period:  2015 – 2018 Work GreenWish Partners and Senergy  are developing a 20 MW solar PV in the rural community of Bokhol in Senegal. The project entails financing, construction, operation and maintenance of a 20 MW ground mounted solar PV plant connected to the grid. The project benefits from[…]

Technical due diligence services for a solar portfolio

  Country:  France Period:  2013 Work 3E acted as the technical advisor of Eneco for more than 50 PV (photovoltaic) projects with an installed capacity of 11.7 MWp (portfolio 1: 5.6 MWP + portfolio 2: 6.2 MWp). Several services were performed in the framework of this technical due diligence mission: • Long term yield assessments[…]

Technical due diligence of DG Infra’s photovoltaic portfolio in Belgium

  Country:  Belgium Period:  2011 – 2015 Work Technical due diligence services on DG Infra photovoltaic portfolio in Belgium. More than 30 rooftop and ground mounted PV projects being developed and constructed by Fabricom (GDF Suez Group). Total capacity of more than 25MW. 3E reports served both the investor (DG Infra) and the lender (KBC[…]

Technical due diligence of Enfinity’s photovoltaic portfolio in Belgium

  Country:  Belgium Period:  2011 – 2014 Work Lender’s technical advisor services on Enfinity’s photovoltaic portfolio (Duty of Care towards Lenders Fieva, Belfuture, and Triodos) in Belgium. More than 60 rooftop PV projects being developed and constructed by Enfinity. Total capacity of more than 40MW. 3E reports served the lenders (Rabobank NL, Triodos Belgium, and[…]

ESMAP – Renewable energy wind mapping

  Country:  Pakistan, Ethiopia, Papua New Guinea, Nepal, Lesotho Period:  2014 – 2017 Work The World Bank has trusted 3E for the calculation of high quality and validated wind resource maps for different countries using mesoscale modelling and an extensive ground based measurement. the first phase of the projects consists on a preliminary map with[…]

Technical Due Diligence of the Milkovista project

  Country:  Romania Period:  2011 Work Ming Yang appointed 3E to perform an audit on the 120 MW Milkovista in Romania, consisting of 48 wind turbines. 3E evaluated the long term energy yield assessment and review the potential grid connection for the project as well as its transport feasibility, before assistance the client in its[…]

Technical Due Diligence of the Allondrelle wind farm

  Country:  France Period:  2013 Work French utility UEM contracted 3E for technical assistance for the acquisition of the 10MW Allondrelle wind farm from Juwi. 3E’s role included the independent energy yield assessment, the financial model review and fine tuning, as well as the review/negotiation of the purchase agreement between the 2 companies.  

Petit Auverné – Lender’s Technical Advisory

  Country:  France Period:  2016 Work Energie Team, a leading French developer and operator with 120MW in operation, contracted 3E for the final acceptance verification of the Petit Auverné wind farm, consisting of 6 Enercon E92 2.3MW. 3E acted as Lender’s Technical Advisor on behalf of Credit Agricole, and inspected the 6 turbines and the[…]

Vleemo – Technical Due Diligence of the Port of Antwerp

  Country:  Belgium Period:  2016 Work Vleemo contracted 3E for the technical Due Diligence of the Port of Antwerpt-right bank project, consisting of 18 Enercon E101 turbines for a total installed capacity of 54MW. The scope of work includes an independent long term energy yield assessment, the review of the building permit and grid connection[…]