Academiestraat – Ghent

Client:  3D Invest Period:  2011 – 2014 Team:  Robbrecht en Daem architecten, architecten Tania Van Den Bussche en Els Claessens, Dierendonckblancke architects, MJ Van Hee Architecten, VK Group, 3E, 3D Real Estate, Van Roey Vastgoed, etc. Work The current fire department and academy site is a fascinating challenge in the area of sustainability due to[…]

The Suikerfabriek heating network – Veurne

Client:  West Flemish Intermunicipal Period:  2013 Work The West-Vlaamse Intercommunale [West Flemish Intermunicipal], abbreviated to Wvi, is responsible for the integrated planning and project development of industrial parks and residential areas on behalf of the province and 54 West Flemish municipalities. Together with the city of Veurne, Wvi is planning a mixed-use urban development, blending[…]

Albertkanaal – Concept study sustainable redevelopment of a business park

Client:  The City of Antwerp Period:  2015 – 2016 Team:  Posad Spatial Strategies, Arcadis, 3E, One Architecture Work The aim of the study is to contribute towards the project area having a sustainable future, with the intention of influencing other business parks experiencing with similar problems. The way in which this is realised is by[…]

Quartier Bleu – Wind comfort and solar analysis – Hasselt

  Client:  Kanaalkom Development NV – Matexi Period:  2016 Work On behalf of Matexi, 3E analysed the wind comfort for pedestrians and future residents of the project area of ‘Quartier Bleu’ in Hasselt. Additionally, an analysis was made of the number of hours of sunlight exposure at several sites located at outside gastro/pub terraces along[…]

Oude Dokken – Ghent

  Client:  AG Stadsontwikkelingsbedrijf Gent Period:  2009 – 2013 Size:  ca. 45 ha Work The city of Ghent acquired the former docksides near the Dampoort railway station in view of redevelopment. 3E was contracted by the city to contribute to the site masterplan for the site reconversion, being developed by OMA, an urban planners’ office.[…]

Energy Port Masterplan – Ostend

  Client:  Autonoom Havenbedrijf Oostende Size:  658 ha, of which 199 ha water surface Period:  2013 – 2014 Team:  3E, i-propeller, MOP Urban Design, Rebel Work In the framework of the European Interreg project “Sustainable Seaports”, a consortium of companies (3E, MOP Urban Design, i-Propeller and Rebel) commissioned by the Autonomous Port Authority Oostende, worked[…]

Cours Saint-Michel – Brussels

  Client:  P&V Size:  13.500 m² Period:  2009 – 2016 Team:  DDS & Partners, Technical and Data Consulting, Herpain, 3E Work P&V’s ”Cours Saint-Michel” building is a 20 year old, 13.500 m² office space in Brussels. The renovation is part of P&V’s sustainability strategy, focused on rationalizing energy use to optimize the added-value and image[…]

DEME Headquarters Masterplan – Zwijndrecht

  Client:  DEME Period:  2015 – present Size:  39 ha of which 10 ha dock Work 3E was contracted by DEME to give form to the masterplan for the DEME site in Zwijndrecht. Through the renovation of its buildings and by an optimal use of renewable energy technologies, an energy-neutral (and if possible energy-autonomous) site[…]

qfghsdth

Masterplan Nieuw Zuid Antwerp

  Client:  City of Antwerp Period:  2011-2012 Size:  400.000 m² Team:  Studio Secchi Vigano, 3E Work Construction has started on Antwerp’s brand new 400.000 m² city quarter Nieuw Zuid. It will be located south of the current Zuid (South) district, right next to the Antwerp Court of Justice. Nieuw Zuid will boast 2,000 residences, next[…]

sfgnbds

Niefhout Turnhout: From heat network feasibility to start of development

  Client:  SLIM Turnhout Location:  Turnhout, Belgium Period:  2014 – 2015 Work On the 8th of September 2015, the Belgian city of Turnhout, the developer ION, Eandis and Veolia signed a cooperation agreement for the development of a district heating network for the “Niefhout” neighbourhood. This heating network will be powered by an energy mix[…]