Supporting the development strategy of urban densification – Bordeaux, France

  Client: Communauté Urbaine de Bordeaux (CUB) Surface area: 800 residential units Team: 51N4E / Grau, 3E Work In the near future, the city of Bordeaux will have to develop approx. 50,000 new homes to meet the increasing demand for housing. The Communauté Urbaine de Bordeaux has appointed 5 multidisciplinary teams to assess and test[…]

Josaphat – Brussels

© MSA Client: IDEA Consult Period: 2014 Team: MSA, IDEA Consult and 3E Work This project concerns the masterplanning of a wasteland in Brussels and its redevelopment for new residential buildings, offices buildings and the required infrastructure. 3E provided strategic guidance on energy & comfort design and water management. Based on the initial situation, 3E[…]

Kuborn – Brussels

  Client: CityDev Period: 2014 Size: +/- 120 dwellings Team: CEI De Meyer (BAM group), DDS & Partners, 3E, VK Engineering, Establis and Eole Work This new building, located close to the Brussels Canal (Rue Kuborn), houses 120 new passive dwellings. During the competition phase, 3E guided the building team in all the aspects of[…]

Abattoir: Shaping a Sustainable Masterplan

  Client: Abattoir NV Period: 2017 – 2018 Work The Abattoir site in Cureghem (Brussels), with its well-known food market and urban farming on top of the Foodmet, plays an important part in the transformation of Brussels. In 2009, Abattoir nv started a masterplan study to “strengthen the Abattoir vision of new commercial short-term developments[…]

Martelaarssite – Brussels

  Client: Advisers Period: 2017 Surface: +/- 13,000 m² Team: Advisers, Wessel De Jong, Climatic Design Work The multidisciplinary team Advisers & Wessel de Jonge Architects – together with 3E en Climatic Design Consult – gathered together in June 2017 to design an integrated, sustainable, flexible and future-proofed building concept located on the Martelaarssite, property[…]

Leopoldkazerne: reconversion of the site

  Client: Democo Group, thv Leopold, Nelson group Period: 2015 – 2021 Team: Democo Group, Matexi, Buroll & Archl+l, 3E, Ingenium Work The government institution “Provincie Oost-Vlaanderen” awarded the consortium (composed of, among others, Matexi, DMI and Democo) with the reconversion of the Leopoldskazerne site in Ghent – Belgium. The site, known for its heritage[…]

Academiestraat – Ghent

Client:  3D Invest Period:  2011 – 2014 Team:  Robbrecht en Daem architecten, architecten Tania Van Den Bussche en Els Claessens, Dierendonckblancke architects, MJ Van Hee Architecten, VK Group, 3E, 3D Real Estate, Van Roey Vastgoed, etc. Work The current fire department and academy site is a fascinating challenge in the area of sustainability due to[…]

Pier Kornel – Feasibility study heating network on former Tupperware site – Aalst

Client:  Dender Development (Matexi & Re-Vive) Period:  2012 – 2014 Work Dender Development (Matexi & Re-Vive) has been planning the redevelopment of a former industrial site into a residential area in East Flanders. Over a period of five years, approximately 600 residential units will be built, ranging from terraced houses to high-rise building The project[…]

Town Hall of Hasselt design support – Hasselt

© Jaspers-Eyers Architects Client:  Democo Group Period:  2015 – 2016 Work 3E provided specific technical support to the Democo Group relating to the problem of private cables for photovoltaic production (in consultation with Infrax), energy performance requirements, BREEAM certification, etc. The structural work for the new Town Hall of Hasselt must be completed by the[…]

Rova Braie – a BREEAM Excellent multi-residential building – Brussels

  Client:  Rova Braie scrl Period:  2010 – 2014 Team:  Herpain, 3E Work The Rova Braie project consists in a multi residential high-standing building located in Brussels city centre. It has achieved a BREEAM Excellent rating at both design and construction stages thanks to high environmental performances, notably high insulation, ground heat pumps, photovoltaic energy[…]

Energy Port Masterplan – Ostend

  Client:  Autonoom Havenbedrijf Oostende Size:  658 ha, of which 199 ha water surface Period:  2013 – 2014 Team:  3E, i-propeller, MOP Urban Design, Rebel Work In the framework of the European Interreg project “Sustainable Seaports”, a consortium of companies (3E, MOP Urban Design, i-Propeller and Rebel) commissioned by the Autonomous Port Authority Oostende, worked[…]

Cours Saint-Michel – Brussels

  Client:  P&V Size:  13.500 m² Period:  2009 – 2016 Team:  DDS & Partners, Technical and Data Consulting, Herpain, 3E Work P&V’s ”Cours Saint-Michel” building is a 20 year old, 13.500 m² office space in Brussels. The renovation is part of P&V’s sustainability strategy, focused on rationalizing energy use to optimize the added-value and image[…]

qfghsdth

Masterplan Nieuw Zuid Antwerp

  Client:  City of Antwerp Period:  2011-2012 Size:  400.000 m² Team:  Studio Secchi Vigano, 3E Work Construction has started on Antwerp’s brand new 400.000 m² city quarter Nieuw Zuid. It will be located south of the current Zuid (South) district, right next to the Antwerp Court of Justice. Nieuw Zuid will boast 2,000 residences, next[…]

sdljkh

Compas Brussels

  Client:  CityDev Location:  Brussels, Belgium Period:  2015 Team:  Immo BAM, DDS & Partners Architects, Atlante, M&R, 3E, Eole, Establis, Venac and Abesco Work COMPAS, the new sustainable district launched by Citydev & SLRB, will reinforce the urban refurbishment of “Les Abattoirs” in Brussels with 129 dwellings and a nursery. The collaborative work between the[…]

bfgdxbdf

Vandermaelen Brussels

  Client:  CityDev Location:  Brussels, Belgium Period:  2014 – 2015 Size:  31 dwellings Team:  CEI De Meyer (groupe BAM), Atlante, M&R Engineering, 3E, Establis, Eole Work After a first collaboration with the heat network project of Tivoli, the collaboration between 3E, CityDev and Immo BAM continues with the project Vandermaelen. Won in July 2014, 3E[…]

tshdh

De Duurzame Wijk – Waregem

  Client:  Wienerberger Location:  Waregem, Belgium Period:  2011-2016 Team:  Wienerberger, Eribo, Wielfaert architecten, 3E Work With ‘De Duurzame Wijk’, 3E is participating in a pioneer project: a NZEB neighbourhood where affordability is a must and in line with Belgian building tradition. ‘De Duurzame Wijk’ is a project supported by Wienerberger. 3E guides Wienerberger during design,[…]

xcvbc

VUB campus Etterbeek – Brussel

  Client:  Vrije Universiteit Brussel Location:  Brussels, Belgium Period:  2012 – present Size:  33.100 m² Team:  Conix RDBM Architects, Talboom, 3E, OCB, Venac, Vandekerkhove Work De VUB wenst de huidige campus te Etterbeek uit te breiden met een variëteit aan functies: 650 studentenkamers, verschillende leslokalen, enkele nieuwe onderzoeksruimtes, enz. Deze ontwikkeling van om en bij[…]

BNP Parisbas

New Headquarters BNP Paribas Fortis – Montagne du Parc Project – Brussels

© THV MdP be baumschlager erberle Styfhals & Partners & Jaspers Eyers – Architects Client:  BNP Parisbas Fortis NV/SA Location:  Brussels, Belgium Period:  2013-2021 Size:  >+/- 100.000 m² Team:  Baumschlager Eberle, Styfhals & Partners, M&R Engineering, Jan Van Aelst, BOPRO, VENAC, ARIES, … Work Baumschlager eberle and partners were assigned the construction of the new[…]