Dilsen-Stokkem wind farm

September 22, 2016
WIND_Reference_Page_Dilsen_825x400.jpg

 
Country:  Belgium
Period:  2015


Work

Vasco Group, a Belgian industrial group, was granted the permit for the construction of 4 wind turbines, for a total installed capacity of 8MW, in Dilsen Stokkem, near the border with the Netherlands. 3E was contracted to finalize the electrical ad civil engineering, manage the tendering process for the wind turbine, electrical and civil work packages, negotiate with the Preferred Bidders, and manage the construction of the project on a daily basis.