
Client: Sodexo Belgium
Location: Sodexo HQ Brussels – Belgium
Size: 10.000 m²
Results
- 75% less comfort complaints
- 37% energy cost savings –> 75k€/year
- CO2 emission reduction of 474 ton Year-to-date, equivalent to the yearly emission of 180 cars (105 gCO2/km – 15.000 km/year)
- Increased operational efficiency by reducing manual fine-tuning of building controls (1/4 FTE)

Client: Ecoffice passive office building
Location: Nijvel/Nivelles – Belgium
Results
- No comfort complaints
- 25% energy cost savings, on top of the state-of-the-art BMS control
- No more BMS fine-tuning

Client: 3E internal research project
Location: 3E HQ Brussels – Belgium
Results
- Increased coworker comfort
- 30% energy cost savings
- Optimal control of a hybrid system consisting of 2 air/water heat pumps, a condensing gas boiler and a 2m³ heat storage

Client: Wattson NV for Senior Living Group
Location: Le Progrès, La Louvière – Belgium
Results
- 15% energy cost savings on heating at a 24/7 occupancy
- Significant time savings in operational follow-up & fine-tuning of building control systems