
Country: France
Period: 2016
Work
Energie Team, a leading French developer and operator with 120MW in operation, contracted 3E for the final acceptance verification of the Petit Auverné wind farm, consisting of 6 Enercon E92 2.3MW. 3E acted as Lender’s Technical Advisor on behalf of Credit Agricole, and inspected the 6 turbines and the substation, before analysing the SCADA data corresponding to the 1st weeks of operation.