
Country: South Africa
Period: 2016 – 2017
Work
3E has been contracted by Mulillo, one of the main wind farm and PV plant developer and operator in South Africa, to act as Independent Engineer with Duty of Care toward Eskom, the grid operator, to monitor the construction of the 240MW projects. The assignment includes an electrical design review to ensure compliance with applicable grid codes, monthly site visit and reporting, as well as ensuring that all PPA requirements are met.